Section 51H Construction
Photo Archive

51H-1. Rock Excavation in Cofferdam for Pier 3 footing.
(November 2009)

51H-2. Excavating for Pier 4 footing.
(November 2009)

51H-3. Pier 5 Pier Table Falsework being constructed.
(November 2009)

51H-4. Pier 2 Pier Table Falsework erection.
(November 2009)

51H-5. Mainline Bridge MF202 looking North from top of Pier 2.
(November 2009)
|