Section 51G Construction
Photo Archive

51G-1. Setting slider beam in place so that Span 2 beams for MF199 can be set.
(August 2009)

51G-2. Rigging concrete beam so that it can be set in place on MF199.
(August 2009)

51G-3. Second concrete beam being slid into position on Bridge MF199.
(August 2009)

51G-4. Bridge MF199 with all concrte beams in place.
(August 2009)

51G-5. Reconstructed Alicia Heights Road.
(August 2009)