Section 51J Construction
Photo Archive

51J-1. Demolition of existing bridge that carried SR88 South over Old National Pike.
(April 2009)

51J-2. Temporary excavation support for Bridge MF211.
(April 2009)

51J-3. Grout holes for Pier 1 of Bridge MF205/206.
(April 2009)

51J-4. Excavation for South 88 Ramp.
(April 2009)

51J-5. Looking South at future location of Bridge MF202.
(April 2009)
Back to top
|