Section 51H Construction
Photo Archive

51H-1. 60" Caissons for Bridge MF202 Pier 5 foundation in various stages of construction.
(March 2009)

51H-2. Reinforcing steel cage for 60" Caisson being hoisted into place.
(March 2009)

51H-3. Placing reinforced steel cage into 60" Caisson.
(March 2009)

51H-4. Placing concrete in 60" Caisson.
(March 2009)

51H-5. Forming for Bridge MF202 Pier 5 footer with completed Caissons.
(April 2009)
|