Section 51G Construction

51G-1. Excavation for Sediment Trap 1.
51G-1. Excavation for Sediment Trap 1.
(September 2008)

51G-2. Mainline excavation.
51G-2. Mainline excavation.
(September 2008)

51G-3. Excavation for Detention Basin/Sediment Basin 51G-1.
51G-3. Excavation for Detention Basin/Sediment Basin 51G-1.
(September 2008)

51G-4. Stripping topsoil.
51G-4. Stripping topsoil.
(September 2008)

51G-5. Section 51F/G interface. Looking East over Dunlap Creek.
51G-5. Section 51F/G interface. Looking East over Dunlap Creek.
(September 2008)