Section 51F Construction

51F-1. Bench excavation.
51F-1. Bench excavation.
(August 2008)

51F-2. Excavating for Bridge MF195/196 Pier 1S.
51F-2. Excavating for Bridge MF195/196 Pier 1S.
(August 2008)

51F-3. Forming Bridge MF195/196 Pier 1S.
51F-3. Forming Bridge MF195/196 Pier 1S.
(August 2008)

51F-4. Mine Grouting Bridge MF195/196 Pier 5.
51F-4. Mine Grouting Bridge MF195/196 Pier 5.
(August 2008)

51F-5. Aerial shot of Section 51F from 51G facing East.
51F-5. Aerial shot of Section 51F from 51G facing East.
(August 2008)