Section 51N Construction
Groundbreaking | Section 51A2 | Section 51B | Section 51C | Section 51D | Section 51E1 | Section 51N

51N-1. Completed Section 51N (Mainline Toll Facility) looking south toward Uniontown with Section 51C and the Searights (S.R. 4010) Interchange at the top of the photo. This Mainline Toll Facility, which is the only mainline toll barrier on the Uniontown to Brownsville project, was built with both High Speed E-Z Pass lanes and conventional tolling lanes.
(October 2008)
Back to top
|