Section 51F Construction
Groundbreaking | Section 51F | Section 51G | Section 51H | Section 51J

51F-1. Pier 1S construction for Bridge MF 195/196.
(September 2008)

51F-2. Construction of temporary shoring for Pier 5 of Bridge MF 195/196.
(September 2008)

51F-3. Pipe and drainage construction.
(September 2008)

51F-4. Blasting holes for mainline excavation.
(September 2008)

51F-5. Aerial shot of Section 51F from 51G facing East looking over Dunlap Creek.
(September 2008)
Back to top
|