Section 51C Construction

51C-1. Bituminous Paving of Relocated Upper Middletown Road (S.R. 4010).
51C-1. Bituminous Paving of Relocated Upper Middletown Road (S.R. 4010).
(September 2006)

51C-2. Construction of Canistra Road Bridge over Expressway.
51C-2. Construction of Canistra Road Bridge over Expressway.
(September 2006)

51C-3. Relocated PENNDOT Maintenance Site Bituminous Paving.
51C-3. Relocated PENNDOT Maintenance Site Bituminous Paving.
(September 2006)

51C-4. Completed mainline pavement looking west from S.R. 4010.
51C-4. Completed mainline pavement looking west from S.R. 4010.
(September 2007)

51C-5. Completed mainline pavement looking east from S.R. 4010.
51C-5. Completed mainline pavement looking east from S.R. 4010.
(September 2007)

51C-6. Canopy of ramp Toll Facility at the on-ramp from the Searights
Interchange to the southbound Expressway.
51C-6. Canopy of ramp Toll Facility at the on-ramp from the Searights
Interchange to the southbound Expressway.
(April 2008)

51C-7. Completed mainline pavement looking south from Canistra Road.
51C-7. Completed mainline pavement looking south from Canistra Road.
(April 2008)