Section 51B Construction
Groundbreaking | Section 51A2 | Section 51B | Section 51C | Section 51D | Section 51E1 | Section 51N

51B-1. Completed Section 51B looking north with Expressway bridge over Fan Hollow Road and the wetlands replacement site in the foreground followed by the Expressway bridges over an Unnamed Tributary to Jennings Run. Completed Section 51C and the Searights Interchange can be seen at the top of the photo.
(October 2008)
Back to top
|