Section 51A1 Construction
Groundbreaking | Section 51A1 | Section 51E2 | Section 51F | Section 51G | Section 51H | Section 51J

51A1-1. Looking south from Oliver Road bridge over Route 119 at location of proposed Expressway interchange with Routes 119 and 51.
(September 2008)

51A1-2. Abutment construction for proposed dual Expressway bridges over Northgate Highway.
(October 2008)

51A1-3. Pier construction for proposed Expressway ramp bridge over Route 119.
(January 2009)
Back to top
|